TLG has extensive experience supporting and directing wind tunnel test campaigns spanning 2D airfoil and 3D vehicle testing across low-speed, transonic, and supersonic flight regimes.
Wind Tunnel Testing Services
- Test Planning
- Instrumentation Specification
- Test Sequencing and Occupancy Optimization
- Test Management
- Facility Coordination
- Test Director Role
- Test Engineering Support
- Model Design and Manufacture
- Model Design Specification
- Model Manufacturer Coordination
- Rapid Prototyping/Additive Manufacturing
- Identify problems one day; test the solution the next
- Reduce model production cost
- Data Reduction
- Facility Corrections Quality Assurance
- Integration of Analysis and Test Data
- CFD Validation and Uncertainty Analysis